CONSULTING

Project Management

Engineering consultants work with clients to assess their needs and translate them into designs, equipment, or new systems. From the initial concept stage through to completion, they manage project timelines and oversee all developments.

Plan Technical Solutions

After assessing projects for technical issues, engineering consultants find unique ways to resolve them without affecting the overall completion deadline or affecting the involvement from other departments or external companies.

Build Relationships with Clients

Engineering consultants attend meetings with clients, architects, local authorities, and manufacturers to create a good rapport with them to fully understand their requirements and provide accurate solutions, as well as to provide them with progress updates along the way.

Prepare Documentation

Engineering consultants are responsible for creating documents and reports that detail their assessments, any fact-finding survey data they’ve acquired, the project’s inception, and concept planning.

APPROVAL

Before beginning construction, property approvals from the Directorate of Town and Country Planning (DTCP) and the Chennai Municipal Development Authority (CMDA) must be obtained. Any irregularities in the same might give rise to legal problems.

How to Get CMDA Approval

By issuing Planning Permissions (PP), the CMDA is an authorised agency charged with controlling real estate development in the Chennai Metropolitan Area. Buildings that fall into the typical permissible categories of industrial, residential, institutional, and commercial use zones are given planning permission (PP) to be built.The local bodies in the Chennai Metropolitan Area have been given the authority to provide Planning Permission (PP) for Subdivision and small layouts up to a specific Sq. ft. Special and multi-story for IT/ITES

Procedure for DTCP Approval

The Directorate of Town and Country Planning (DTCP) is responsible for carrying out development activities. The entire area of the state is classified as either Master Plan Area or Non- Master Plan Area.Taking into account the suitability of a site, accessibility, and compatibility with the adjoining development the Local Planning Authority regulated the physical development of the Town, according to the land use envisaged in the Master Plan & Detailed Development Plan.

Before commencing any construction it is mandatory to obtain necessary permission from CMDA / DTCP. The approval number of CMDA or DTCP will be displayed on the approval layout designing.

On the designing of the approved layout, the CMDA or DTCP approval number will be visible.

CONVERSION OF LAND

NOC (Land Conversion) WET LAND

Wet Land NOC is the process of converting land from being used for agriculture to being used for other purposes. There are rules that outline the process for changing the use of land from one purpose to another. Use of land for any use other than agricultural, such as residential, commercial, or industrial purposes, requires approval from the competent government. If any wet land is to be used for non-agricultural purposes, the District Collector's NOC must be acquired. If the Master Plan permits, officers from various Departments working under District Collectors personally inspect the land, verify it, and grant NOC. Based on the Collector's report, either the CMDA or the DTCP decides to reclassify the land.

MASTER PLAN ZONE

The creation of master plans for towns and cities is essential to the allocation of land for residential, commercial, industrial, public, semi-public, traffic and transportation, parks, etc. Every Survey Number on the Master Plan has an allotment after taking into account the current land usage, as mentioned above. In accordance with the proposed Master Plan, we also have Detailed Development Plans and New Town Development Plans. The permitted uses for each zone and survey number are outlined in the zoning regulations on the use of land and buildings. It has been proposed that the regions could fall under.

EDUCATION APPROVAL

NOC for Sectors in Education

Starting a school, especially in Tamilnadu, may be difficult because getting the necessary approvals may take more than a year and cost additional money, depending on the type of authorization required. After the land is registered, we can start building the school right away after receiving the state government's NOC.

For the educational institute to open its doors, the State Government NOC is necessary, regardless of whether it is for CBSE or another Board. We must also submit applications for any further approvals that are necessary, such as certificates from municipal corporations, health departments, child welfare organisations, etc., and obtain clearance from local authorities for things like safety, cleanliness, and sanitation.

VASARKKAL facilitates a seamless process from payment to receiving a NOC, and as a result

LAYOUT DEVELOPMENT

The Layouts are created in accordance with the Master Plan, Detailed Development Plan, and New Town Development Plan's stipulated land use zone classification. The local bodies will approve if the land area is less than 5 acres, and the DTCP Chennai Head Office will deal with it if it is more than 5 acres. In contrast, if the land area is inside the Panchayat boundaries, local body approval is adequate for up to 10 acres, and for any area larger than that, the approval will be transmitted to the DTCP Head Office.

We will initially simply be given the Road pattern drawing.

The developer is required to follow these guidelines and construct a black top road in accordance. The government authorities (DTCP / CMDA) must get verification of the road and the gift deed from the developer before sanctioning the layout's final approval following an inspection.

How effectively the design meets the need for infrastructure is a key indicator of a successful land development. This change in design is advantageous to developers since it gives them a competitive edge in the market, decreases upfront expenses, and lowers risk.

We create layouts to meet the greater expectations and standards of modern community members. Any client who wishes to maximise potential through the selection of the ideal subdivision layout is welcome.